Magnesium Elektron – concrete hard standing

Client: Magnesium Elektron

Duration: 4 weeks

Start Date: June 2014

Excavated to reduced levels and re graded the whole area following the demolition of some out buildings. Formed approximately 20 concrete pads to take the load of a new pipe line that was to be installed.

Formed new concrete hard standings and made good the road surface. On completion we fitted Armco barriers.

IMG 1675

IMG 1672



 

Magnesium Elektron logo

011

IMG 1245